Project: Site Investigation and Feasibility Study for Upgrade of Existing Sewage and Surface Water Drainage for Lekki
Assignment Name
| Country |
|---|
| Site Investigation and Feasibility Study for Upgrade of Existing Sewage and Surface Water Drainage for Lekki | Nigeria | Location within Country
| Professional staff provided by your firm |
|---|
Lagos State | 12 | | Name of Client | Number of Staff |
|---|
Chevron Nigeria Limited | 15 | | Address | Number of staff months/Project Duration |
|---|
Kilometre 19, Epe Expressway PMB 12825, Lagos, Nigeria | 150 man-months; 10 months | | Start Date | Completion Date | Approx. Value of services in Current US$ |
|---|
Nov. 1999 | Sept. 2000 | $39,000.00 | | Name of Associated Consultants If any | Number of months of professional staff provided by associated consultants |
|---|
| | | | Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed: |
|---|
- Project Director/Coordinator: K.G. Till, P.Eng.,
- Project Coordinator: John Rowe
- Team Leader: Kolawole Jegede
- Design Team Leader: Engr. Oladapo Ogunbanjo
| | Narrative Description of Project |
|---|
Site investigation at Lekki and preparation of Feasibility Study of viable alternatives to upgrade the existing sewage and surface water drainage at Lekki. | | Description of actual services provided by your staff |
|---|
Work included provision of personnel for carrying out onsite and topographical survey of the drainage channels. In included confirmation of the storm and sanitary drains connected to various drainage systems using dye tracing and/or other appropriate methodologies. The placement of ground control for aerial photography and survey into Federal/State Monuments was also a part of this project. Aerial photography interpretation to assess environmental issues was also undertaken as part of this project. |
|