Project: Detailed Engineering Design for Benikrukru Village Water Supply.
Assignment Name
| Country |
|---|
Detailed Engineering Design for Benikrukru Village Water Supply.
| Nigeria
| Location within Country
| Professional staff provided by your firm |
|---|
Delta State
| 3
| | Name of Client | Number of Staff |
|---|
Chevron Nigeria Limited
| 8
| | Address | Number of staff months/Project Duration |
|---|
Kilometre 19, Epe Expressway PMB 12825, Lagos, Nigeria
| 16 man-months; 2 months
| | Start Date | Completion Date | Approx. Value of services in Current US$ |
|---|
September, 1999
| May, 2003 | $58,000.00
| | Name of Associated Consultants If any | Number of months of professional staff provided by associated consultants
|
|---|
BGP-Reid Crowther, U.K.
| 10 man-months; 2 months
| | Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed: |
|---|
- Project Director/Coordinator: K.G. Till, P.Eng.,
- Project Coordinator: John Rowe
- Design Team Leader: Mike Whiting
- Project Engineer: Derek Dixon
| | Narrative Description of Project |
|---|
Detail Design Engineering and Consultancy services for a Water Abstraction, Treatment, Supply and Distribution System for the Village of Benikrukru in Delta State.
| | Description of actual services provided by your staff |
|---|
Site Survey/Investigations, Design of Aeration System, Filtration System and Post Filtration System, Elevated Storage and Chlorination, Detail Design Engineering and consultancy services for the Water Abstraction, Treatment, Supply and Distribution System for the Village of Benikrukru in Delta State, Construction Drawings and Schedules, Procurement Schedules, as well as preparation of Operation and Maintenance Manuals, Site Supervision, Commissioning and Training.
|
|